 I met with Jack from the county and Chad with Granger Dirtwork to walk through the site. Contractor will need to place more base rock on roadway on both ends. The grout at the outer edges will need some attention. It is flaking up at the edges. Contractor will come back in a week to do repairs, some rip rap needs to be added at the east end of the bidge as well.