12:36pm- Prepping deck machine for installation
12:40pm- Inspecting rebar for proper installation and making sure all joints are tied
1:05pm- Inspecting the level of the machine to ensure proper deck height
2:35pm- Adjusting the level and inspecting the rollers to ensure proper concrete coverage
3:57pm- Plumbing water pump for proper water coverage after deck is poured